ANALYSIS PRODUKTIVITY OF EXCAVATOR KOMATSU PC 2000 0N OVERBURDER REMOVAL PT. JHONLIN BARATAMA

  • I Wayan Wawan Mariki Politeknik Batulicin
  • Duan Arpilanoor Politeknik Batulicin
  • Heldayanti Politeknik Batulicin
Keywords: cycle time, produktivity, match factor, swell factor

Abstract

In mining activities, one of the overburden activities is heavy equipment working at PT. Jhonlin Baratama in digging and loading using a PC 2000 excavator for the productivity process. With the company's production target of 865 BCM/hour. This research aims to determine the data of the cycle time in the excavator productivity of the excavator PC 2000 by using the calculation method match factor. The results of the calculation of the total average cycle time of the excavator is PC 200030.33 seconds, with a Bucket capacity of 12 BCM, Fill factor 0.9%, Swell Factor 0.8 with efficiency work 0.79%, while the total average HDK conveyance is Komatsu 78510.61 seconds and HDK Komatsu 465 is 9.99 minutes, from the calculation of the productivity of the excavator PC 2000 of 810 BCM/hour so that the production target has not been achieved optimally because in processing the macth factor is 0.74.

Downloads

Download data is not yet available.

References

Anonim. 2018. PT. Jholin Baratama Batulicin Coal Project Site Sungai Dua. HRD Department PT. Jholin Baratama Batulicin.

Mustofa Romat ali. 2017 Kegiatan Mekanisme Survay PT. Jholin Baratama Batulicin Coal Project Site Sungai Dua PIT Trambesi. Politeknik Negeri Banjarmasin

Surya putra, Agust. 2009. Kajian Teknis Produksi Alat Muat dan Alat Angkut Pada Kegiatan Tanah Penutup PT. Marunda Grahamineral Di Kecamatan. Laung Tuhup Kabupaten Murung Raya : Jogyakarta.

Yanto. 2015. Menaknis Pemindah Tanah. Sekolah Tinggi Teknologi Nasional :Yogyakarta.

Tenriajeng, 2003. Pemindah Tanah Mekanis. Gunadarma : Jakarta

Gaspersz, 1990. Analisis kuantitatif untuk perencanaan, penerbit “Tarsitoâ€, Bandung

Newman, A., Rubio, E., & Eurek, K. (2010). A Review of Operations Research in Mine Planning. Journal Interface Vol. 40 No. 3 pp. 222-245

ESDM, 2011. Mineral and Coal 2011, Direktur Jenderal Mineral dan Batubara, Jakarta.

ESDM, 2003, 2004, 2008 dan 2009. Directorate Program Supervision of Mineral, Coal and Geothermal, 2003, 2004, 2008 dan 2009, 2008, Indonesia Mineral, Coal, Geothermal and Groundwater, Directorate General of Mineral, Coal and Geothermal, Ministry of Energy and Mineral Resources, Jakarta.

Morley, D., Joseph, T., & Lu, M. (2012). In Search Of the Ideal Truck-Excavator Combination. Proceeding Departement of Civil and Environmental Engineering, (pp 1-8). Canada: University of Alberta.