ANALISA PENGOPERASIAN 1 CWP DAN 2 CWP PADA COOLING WATER SYSTEM PLTU ASAM ASAM UNIT 4
Abstract
Electric power is used to support daily life, therefore electrical energy must be continually developed considering the increasing need for this energy. Therefore it is necessary to do preventive, corrective maintenance and efforts to optimize the generating unit such as savings in the production process, one of which is by analyzing the operation of a Circulating Water Pump CWP at the Unit 4 Acid-Acid Power Plant. The formulation of the problem in this study is that in the manufacturer's design for 65 MW full load 2 CWP pumps are needed, this can be seen from the pump specification data, but in fact with only a Circulating Water Pump CWP can produce a full load of 65 MW.
Downloads
References
ASME PTC 6, 2004. Steam Turbines.
ASME PTC 23, 2003. Atmospheric Water Cooling Equipment.
Gumilar, 2011. Sistem Air Pendingin.
Incropera, 2007. Heat Transfer & Fluid Book Frank Incropera Fundamental Sofheat & Mass Transfer.
Perry’s Chemical Engineer Handbook 1999.
PT PLN PERSERO, 2018. Perhitungan NKO Korporat.
Y. A. Çengel and M. A. Boles. 1994. Thermodynamics: An Engineering Approach, 5th ed, McGraw-Hill.